The data center building could be as high as 35 meters with a floor area of 60,000 square meters.

900MW Kruonis Hydro Pumped Storage Power Plant.

Up to 250 MW capacity solar power plant to be opened in 2030.

Cooling water sources available nearby.

Two substations are already involved in the site planning document.

Dedicated land plot of 185 acres/75 hectares.

Free air cooling option – average annual temperature is as low as 7°C / 44.6°F.

330 kV power transmission line installed. Zero power outages in recent history.

A 30 min drive from Lithuania’s nearest major city Kaunas. Proximity to the highway - 15 km. Proximity to Kaunas International Airport - 43 km.

/

KRUONIS SITE

Kruonis site

A prime location for a data center

Type

Greenfield

Plot size

75 ha

Power capacity

Up to 100 MW

Green energy availability

100%

Fiber connectivity

Fiber network installed 1 km from the site

Financial incentives

State support:

  • Tax cuts of up to 15% on cost of electricity for large-scale consumers
  • Up to 20% state support on your investment, including long-term assets and premises leasing, for all investments exceeding €100 million

In addition, Kruonis Technology Park is classified as a Free Economic Zone, which means it also offers 0% tax on real estate

Proximity to key logistics infrastructure
  • Lithuania’s second largest city (Kaunas) – 40 km
  • Closest town (Kaišiadorys) – 17 km
  • Closest international airport (Kaunas International Airport) – 43 km
  • Closest highway – 15 km